News
News and information
APG series internal meshing gear pump commissioning matters needing attention
Release time:
2023/08/29 15:42
Prepare:● Check to confirm that the installation of the system has been completed in a careful and clean manner.● Only fill hydraulic oil through filters with the required minimum retention rate.●Fill the pump with hydraulic oil through the oil suction pipe or pressure pipe.●Check that the direction of rotation is adhered to for the pump type.
Jiangsu Aoad Fluid Technology Co., Ltd.
Address: Economic Development Zone, Hai'an City, Jiangsu Province
Mobile: 86-15851282837
Telephone (fax): 86-0513888180009
E-mail:adltchen@ntokdo.cn
Copyright©2023 Jiangsu Aoad Fluid Technology Co., Ltd. All Rights reserved |Business License| Label | city substation