APG series internal meshing gear pump commissioning matters needing attention

Release time:

2023/08/29 15:42

Prepare:● Check to confirm that the installation of the system has been completed in a careful and clean manner.● Only fill hydraulic oil through filters with the required minimum retention rate.●Fill the pump with hydraulic oil through the oil suction pipe or pressure pipe.​​​​​​​​●Check that the direction of rotation is adhered to for the pump type.